SOFAR 1.1K~3.3KTL-G3 User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
Therefore, check the outer packing materials before installing the inverter. Check
the outer packing materials for damage, such as holes and cracks. If any damage is
found, do not unpack the SOFAR 1.1K~3.3KTL-G3 and contact the dealer as soon
as possible. You are advised to remove the packing materials within 24 hours
before installing the SOFAR 1.1K~3.3KTL-G3 inverter.
Checking Deliverables
After unpacking the inverter, check whether deliverables are intact and
complete. If any damage is found or any component is missing, contact the dealer.
Table 3-1 shows the components and mechanical parts that should be delivered.
Metal terminals secured
to PV+ input power
cables
Metal terminals secured
to PV- input power
cables