SOFAR 1.1K~3.3KTL-G3 User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
3.6. Moving the SOFAR 1.1K~3.3KTL-G3
This topic describes how to move the to the installation position Horizontally
SOFAR 1.1K~3.3KTL-G3.
Step 1 Open the packaging, insert hands into the slots on both sides of the
inverter and hold the handles, as shown in Figure 3-6 and Figure 3-7.
Figure 3-6 Moving the inverter (1)
Figure 3-7 Moving the inverter (2)
Step 2 Lift the SOFAR 1.1K~3.3KTL-G3 from the packing case and move it