80-136KTL User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
- 24 -
Figure 4-5 auxiliary handle position
4.5.2 Lifting Equipment
1. Tighten the screws of two M12 rings into the inverter sides according to
the instruction diagram below (Note: M12 rings need self-preparation)
Figure 4-6 Installation of Rings
2. Fastened and tied the rope through two rings. Lifting inverter 50 mm
above ground by using lifting equipment, check the tightening device of
the hoisting ring and rope. After confirming that the binding connection
is secure, lift the inverter to the destination.