SOFAR 3K~6KTLM-G2 User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
read and understand the content of the symbols, and then start the installation.
There is a residual voltage in the inverter! Before opening the
equipment, operator should wait for five minutes to ensure the
capacitor is discharged completely.
Caution, risk of electric shock.
CE marking
The product complies with the requirements of the applicable
EU directives.
Please read this manual before install SOFAR 3K~6KTLM-G2.
This indicates the degree of protection of the equipment
according to IEC standard 70-1 (EN 60529 June 1997).
Positive pole and negative pole of the input voltage (DC).
RCM (Regulatory Compliance Mark)
The product complies with the requirements of the applicable
Australian standards.