EasyManua.ls Logo

Sofar solar 3KTLM-G3 - Checking Outer Packing Materials; Checking Deliverables

Sofar solar 3KTLM-G3
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SOFAR 3K~6KTLM-G3 User manual
Copyright © Shenzhen SOFAR SOLAR Co., Ltd
- 12 -
Therefore, check the outer packing materials before installing the inverter.
Check the outer packing materials for damage, such as holes and cracks. If any
damage is found, do not unpack the SOFAR 3K~6KTLM-G3 and contact the
dealer as soon as possible. You are advised to remove the packing materials
within 24 hours before installing the SOFAR 3K~6KTLM-G3 inverter.
Checking Deliverables
After unpacking the inverter, check whether deliverables are intact and complete.
If any damage is found or any component is missing, contact the dealer.
Table 3-1 Shows the components and mechanical parts that should be delivered.
NO.
Picture
Description
Quantity
1
3K~6KTLM-G3
1pcs
2
Rear panel
1pcs
3
PV+ input terminal
2pcs
4
PV- input terminal
2pcs
5
Metal terminals secured to
PV+ input power cables
2pcs
6
Metal terminals secured to
PV- input power cables
2pcs

Related product manuals