6. 6. Dependingonthegridconguration,connectL1,L2,L3andNtotheterminals
according to the label and tighten the screw on the terminal using a screwdriver.
Phase lines use M12 terminal connector, PE line use M8 terminal connector. The
position of “PE” Line and “N” Line should not be opposite. Opposite position may
cause inverter permanently faulty.
7. 7. Close wiring box cover, and tighten the screw.
single core cable is wired as follows:
Installation and User Manual 35/78
Electrical Connections