EasyManua.ls Logo

SolaX Power X1-Hybrid-5.0-LV - Page 66

SolaX Power X1-Hybrid-5.0-LV
93 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical Connections
62
DO_1 and DO_2 are dry contact output ports that can be used to start exter-
nal devices such as generators and adaptor boxs.
Dry-contact definition
Dry-contact output connection steps
Step 1. Strip the insulation layer (length: 15mm) at one end of the cable. And
cut o󰀨 the 6 cables (length:6-8mm), keep the rest 2 cables.
15 mm
6-8 mm
1) White with orange stripes
2) Orange
3) White with green stripes
4) Blue
5) White with blue stripes
6) Green
7) White with brown stripes
8) Brown
Step 2. Find DO_1 and DO_2 port. For Communication connection, you
can select any port from COM 1, COM 2 and COM3.
DO_1 DO_2
For dry-contact output connection, you can select any two cables from the
following four groups: white with orange stripes, Orange; white with green
stripes, blue; white with blue stripes, green; white with brown stripes, brown.
Note!
it is recommanded to use CAT5 Cable.

Other manuals for SolaX Power X1-Hybrid-5.0-LV

Related product manuals