Electrical Connections
48
For battery connection from 4.6 kW to 6.0 kW:
Step 8. Remove the screw.
Step 9. Use cross screwdriver to tighten the
screw. Twist to tighten the swivel nut. .
Step 5. Remove the plug.
35-50 mm²
Recommend 35 mm² copper wire
+ -
M6
5.0±0.1 N·m
+
-
+ -
Step 6. Pass the previously prepared cables
through the corresponding the swivel nut.
+
-
Step 7. Find the battery interface, insert the positive cable into BAT+ port and the negative cable
to BAT-port.
+ -
M6
5.0±0.1 N·m
+
+
-
-
-
+
+
-
Note!
If only the battery is connected but the PV, GRID, and GEN are
not connected, to start the inverter, press and hold the battery
power on button until the screen is on.