EasyManua.ls Logo

SolaX Power X3-Hybrid-10.0-D-E - Page 30

SolaX Power X3-Hybrid-10.0-D-E
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setting
This function is used for setting of the inverter time, connection, battery, grid and
so on.
Enduser can set Date Time, Language and Ethernet directly.
But for advance setting, it requires installer password to operate most of the
professional settings.
Date Time
Language
Ethernet
Setting
b) Language
This inverter provides several languages for customer to select.
a) Date Time
This interface is for user to set the system date and time.
>2013 - 06 - 06
10 : 19
Date time
English
Deutsch
Language
c) Ethernet
There are two modes to obtain IP address: static and DHCP.
User can set the information about ethernet such as IP address, subnet mask
number and default gateway number and Mac address.
> IP Method
static
Ethernet
56
57
Setting Setting
d) Work mode
There are 4 work modes for choice.
>Mode Select
Force time use
Work Mode
> Charge
Start time 1
08:00
Work Mode
>Charger period 1
From Grid
Enable
Work Mode
For “Force Time Use” mode, there are 2 parameters that needs to be set.
> Charge
End time 1
08:00
Work Mode
>Charger period 2
From Grid
Enable
Work Mode
> Charge
Start time 2
08:00
Work Mode
> Charge
End time 2
08:00
Work Mode
All these work modes is available for on-grid condition only:
Battery will stop discharging to keep higher capacity when the
grid is on. when the power generated by PV is not enough, the
battery will discharge to supply the local loads too. And if still
not enough, the grid will power the local loads together.
This work mode applies to the area where suffering from
blackout regularly.
The priority of inverter output power is:
feeding to the grid supplying the load charging the
battery.
This work mode applies to the area with high feed-in tariff.
Self Use
(default)
Force Time Use
Back Up Mode
Feed in Priority
The PV generated power will be used to supply the local loads
first, then to charge the battery. The redundant power will
export to the public grid.
When there is no PV supplied, battery will discharge for local
loads first, and grid will supply power when the battery capacity
is not enough.
The priority of inverter output power is:
supplying the load charging the battery feeding to the
In this work mode the charging and discharging time can be set
flexibly, and it also allows to choose whether charge from the
grid or not. Other time it follows the priority of Self Use mode.
Parameter Comment

Related product manuals