EasyManua.ls Logo

SOMLOS G1+ - Page 35

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The picture above is for your reference.
When your garden with different zones, and 2 zones all need to be cutted, pls check the set up process
as below:
1.Between the passage of the 2 lawns, the width of 2 cables should be within 5cm;
2.When robot have finished the work in zone1, you need to choose the manual mode and then put the robot on the
cable inside zone2, then the robot will work ;
3.After finishing work inside zone2, robot will stop on the cable, then you need to manually lift the robot to the dock
station.
4.This set-up procedure could be available for 2 zones, you could follow the steps.
ZONE 2
FP
ZONE 1

Related product manuals