EasyManua.ls Logo

Sonnen sonnenBatterie eco 8.0 User Manual

Sonnen sonnenBatterie eco 8.0
63 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
+49 (0) 8304 / 92933 - 444 · info@sonnenbatterie.de · www.sonnenbatterie.de
Installation instructions sonnenBatterie eco 8.0
for authorised electricians
KD-291 · Part no. 52205 · X01

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Sonnen sonnenBatterie eco 8.0 and is the answer not in the manual?

Sonnen sonnenBatterie eco 8.0 Specifications

General IconGeneral
Warranty10 years
Battery Capacity8 kWh
Inverter TypeHybrid
ChemistryLithium Iron Phosphate
CommunicationWi-Fi, Ethernet
Nominal Voltage48 V
Cycle Life10, 000

Summary

1 Information about this document

2 Safety

2.1 Intended Use

Defines the proper application of the sonnenBatterie eco 8.0.

2.2 Requirements for the electrician

Outlines the qualifications and certifications needed for installers.

2.3 General safety information

Provides crucial safety precautions for operating and handling the system.

2.5 Warnings

Highlights specific, critical safety warnings to prevent injury or damage.

3 Product description

3.1 Technical data

Details the technical specifications, capacities, and dimensions of the system.

5 Installation

5.1 Scope of delivery

Lists all items included in the system's delivery package.

5.6 Installing the storage system

Covers the physical mounting and installation of the storage system.

5.6.4 Mounting the storage system

Guides on physically attaching the system cabinets to the wall or floor.

6 Electrical connection

6.1 Working on the electrical distributor

Covers tasks related to components within the main electrical panel.

6.4 Connecting the mains line

Instructs on connecting the primary AC power supply to the system.

6.7 Installing the battery modules

Guides on the physical installation and connection of battery modules.

6.7.6 Connecting the DC lines

Provides instructions for correctly connecting the DC power cables.

6.8.2 Connecting earthing conductor

Guides on connecting the protective earthing conductor.

7 Commissioning

7.1 Initial commissioning

Covers the initial checks and procedures before system startup.

7.1.1 Commissioning checklist

A list of points to verify before powering on the system.

7.2 Switching on the storage system

Details the correct sequence for powering on the storage system.

7.2.2 Switching on the storage system

Step-by-step instructions for activating the storage system.

7.3 Running the commissioning wizard

Explains how to use the software wizard for system configuration.

7.3.1 Establishing connection to storage system

Guides on connecting a laptop to the system for configuration.

7.3.2 Running the commissioning wizard

Details the process of completing the system configuration wizard.

8 Troubleshooting