EasyManua.ls Logo

Spell Shift - Assembly Requirements; Tools and Assistance Needed; Power Cable Requirement; Work Surface Preparation

Default Icon
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
min 2x
min 3m
17 MM
What you will need:
- Ring spanner or a ratchet ring spanner
- At least 4 strong hands to carry and turn over the solid wood table of 70-80kg.
- For the “Urban Plus” & “Metropolitan Pro” models at least 3-4 meters of power cable.
- Use a soft underground surface to work on, such as a thick carpet or on the existing packaging.
2
If you have any questions, please call us.
P.O. Box 5515, 6802 EM Arnhem, the Netherlands | +31 (0)26 3610162 | info@spell-online.com | www.spell-online.com