EasyManua.ls Logo

STIEBEL ELTRON SOM 8 PLUS - Page 65

STIEBEL ELTRON SOM 8 PLUS
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
65
This function helps to contain the spread of Legio-
nella in DHW stores by systematically activating the
afterheating.
For thermal disinfection, the temperature at the al-
located sensor has to be monitored. This protection
is ensured when, during the monitoring period, the
disinfection temperature is continuously exceeded
for the entire disinfection period.
If the thermal disinfection function is activated, the
monitoring period starts as soon as the temperature
at the allocated sensor falls below the disinfection
temperature. When the monitoring period ends, the
allocated reference relay activates the afterheating.
The disinfection period starts to count as soon as the
temperature at the allocated sensor exceeds the dis-
infection temperature.
If the temperature at the allocated sensor exceeds
the disinfection temperature by more than 5 K
[10 °Ra], the reference relay switches o until the
temperature has fallen below a value of 2 K [4 °Ra],
above the disinfection temperature.
Thermal disinfection can only be completed when
the disinfection temperature is exceeded for the
duration of the disinfection period without interrup-
tion.
If the disinfection conditions have been fullled by
solar loading before the monitoring period ends,
thermal disinfection is considered complete and a
new monitoring period begins.
Thermal disinfection
Due to the exible control logic, the exact time of
thermal disinfection is not predictable. In order to
set a xed time for the disinfection to be run, the st-
arting delay must be used:
If the starting delay option Starting time is activa-
ted, a starting time for the thermal disinfection with
starting delay can be adjusted. The activation of the
afterheating is then delayed until that starting time
after the monitoring period has ended.
If the monitoring period ends, for example, at 12:00
o'clock, and the starting time has been set to 18:00,
the reference relay will be energised with a delay of
6 hours at 18:00 instead of 12:00 o'clock.
If, during the waiting time, the disinfection condi-
tions are fullled by solar loading, thermal disinfec-
tion is considered complete and a new monitoring
period begins.
Adjustment channel Description Adjustment range / selection Factory setting
Demand Demand relay selection system dependent system dependent
Circulation pump Circulation pump option Yes, No No
Relay Circulation pump relay selection system dependent system dependent
Sensor Disinfection sensor selection system dependent system dependent
Monit. Monitoring period 0 ... 30:1 ... 23 (dd:hh) 01:00 (1 day)
Temperature Disinfection temperature 45 ... 90 °C [114 ... 194 °F] 60 °C [140 °F]
Duration Disinfection period 0.5 ... 24.0 h 1 h
Start. time Starting delay option Yes, No No
Start. time Starting point 00:00 ... 23:30 20:00
Function Activation / Deactivation Activ., Deactivated Deactivated
Heating / Opt. functions / Add new function... / Th. disinfection
295931-36390-8667 SOM 8 plus_en.indb 65 20.10.2011 13:14:54

Related product manuals