WPL 10 A, WPL 10 I, WPL 10 IK
WPL 7 AS, WPL 7 IKS, WPL 10 AS, WPL 10 IKS
Compact air/water heat pump
installation instructions
The installation (water and electrical work) and commissioning, as well as the maintenance of
this equipment, must only be carried out by an authorised qualified contractor in accordance with
these instructions.
Content Page
1 General information 2
1.1 Equipment description 2
1.2 Function 2
1.3 Correct operation 2
1.4 Incorrect operation 2
1.5 Regulations and standards 2
1.6 Standard delivery and accessories 2
2 Specification 3
2.1 Specification triplephase 3
2.2 Performance diagram triplephase 4
2.3 Specification singlephase 5
2.4 Performance diagram singlephase 6
3 Installation, connection and
sound emissions 7
3.1 Transport 7
3.2 Installation location 7
3.3 Heating water connection 7
3.4 Circulation pump 9
3.5 Condensate drain 10
3.6 Buffer cylinder 10
3.7 Second heat source 12
3.8 Casing components 12
3.9 Installing the air hoses 12
4 Electrical connection 13
5 Commissioning 22
6 Operation and control 22
7 Maintenance and cleaning 22
8 Troubleshooting 23
Commissioning report 24
Guarantee 27
Environment and recycling 27
Information for the owner of the heat pump
heating system
Keep these operating instructions safely and
pass them on to any new user, should the
equipment change hands. Let your contractor
check their content in conjunction with any
maintenance or repair work.
26_03_01_0295
Risk of injury
Where children or persons with
limited physical, sensory or mental capa-
bilities are to be allowed to control this
appliance, ensure that this will only happen
under supervision or after appropriate in-
structions by a person responsible for their
safety.
Children should be supervised to ensure
that they do not play with the appliance.