EasyManua.ls Logo

Subzero 424 - Installation Checklist

Subzero 424
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Checklist 50
Complete the Installation
F
or framed, overlay and flush inset applications, follow
these steps to complete the installation. Before installing
the kickplate, be sure to reinstall the drain pan. Once the
drain pan is in place, screw the kickplate the to brackets
attached to the inside surface of each roller base. Reinstall
the grille following the instructions on page 33. Turn power
back on to the electrical outlet.
Installation Checklist
The importance of the installation of the Sub-Zero wine
storage unit cannot be overemphasized. Proper installa-
tion is the responsibility of the selling dealer or installer.
IMPORTANT NOTE: To ensure a safe and proper installa-
tion, the following checklist should be completed by the
installer to ensure that no part of the installation has been
overlooked.
Any questions or problems regarding the installation
should be directed to your Sub-Zero dealer or Sub-Zero
customer service at 800-222-7820. You may also check
the contact & support sectionofour website, subzero.com.
INSTALLATION CHECKLIST
Has the packing material been removed?
Turn the unit on. Is it operating properly?
If not, is the unit plugged in? Is the control turned on?
Have the anti-tip brackets been installed securely and
properly engaging the unit?
Is the unit leveled properly on a solid, level floor?
Is the kickplate installed?
Has the drain pan been installed properly
(model WS-30)?
Are panels attached securely and properly aligned?
Has the door been aligned for proper appearance and
operation?
Has the unit been properly anchored to the opening?
Does the 90° door stop need to be installed?
Does your customer understand the unit’s operation?
Have you given your customer the warranty package?
Have any installation or service problems been noted
on the product registration card? Has the registration
card been mailed in?
Has the stainless steel door been inspected for any
imperfections? This is to be done by the dealer or
installer with the customer upon completion of the
installation. Classic, platinum and carbon stainless
steel panels are covered by a limited 60-day parts and
labor warranty for cosmetic defects.

Related product manuals