Section 4 PAGE
INSTALLATION 29 4.1 MOUNTING OF COMPRESSOR
29 4.2 VENTILATION AND COOLING
29 4.3 SERVICE AIR PIPING
29 4.4 COUPLING ALIGNMENT CHECK
29 4.5 FLUID LEVEL CHECK
30 4.6 MOTOR ROTATION DIRECTION CHECK
31 4.7 ELECTRICAL PREPARATION
Section 5
OPERATION
33 5.1 GENERAL INTRODUCTION
33 5.2 PURPOSE OF CONTROLS- INTRODUCTION
33 5.3 PURPOSE OF CONTROLS- GUIDE
34 5.4 INITIAL START-UP PROCEDURE
34 5.5 SUBSEQUENT START-UP PROCEDURE
34 5.6 SHUTDOWN PROCEDURE
Section 6
SUPERVISOR
CONTROLLER™
35 Figure 6-1 Supervisor Controller™ Control Panel
Section 7
MAINTENANCE
37 7.1 GENERAL
37 7.2 DAILY OPERATION
37 7.3 MAINTENANCE AFTER INITIAL 50 HOURS
OF OPERATION
37 7.4 MAINTENANCE EVERY 1000 HOURS
37 7.5 MOTOR BEARINGS
37 7.6 FLUID MAINTENANCE
38 7.7 PARTS REPLACEMENT AND ADJUSTMENT
PROCEDURES
38 AIR FILTER MAINTENANCE
38 FLUID FILTER MAINTENANCE
39 SEPARATOR ELEMENT MAINTENANCE
39 OIL RETURN/SIGHT GLASS MAINTENANCE
39 PRESSURE REGULATOR ADJUSTMENT
40 COMPRESSORS WITH OPTIONAL SPIRAL VALVE
40 SHAFT COUPLING MAINTENANCE