EasyManua.ls Logo

Sullair SD-300 - Electrical Control

Sullair SD-300
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION, START-UP & MAINTENANCE MANUAL
SD-220 TO SD-600
REV 04 – 10 Oct 2003
Page 14 of 32
3.2.3. Electrical Control
DANGER!
Work on electrical installations may only be done by a specialist or by
other persons instructed in this type of work as long as they are under
the instruction and supervision of a specialist; the general rules for
working with electricity must be followed!
You will find the operating and control voltage on the data sheet.
The Sullair
SD-220 to SD-600 adsorption dryers are normally operated with a PLC
controller. The set times are adjusted at the factory during the test run.
CAUTION!
Do not change these adjustments!

Related product manuals