Home
Sullair
Water Filtration Systems
ShopTek ST15
Page 36 (Piping and Instrumentation-ST11, ST15)
Sullair ShopTek ST15 - Piping and Instrumentation-ST11, ST15
60 pages
Manual
To Next Page
To Next Page
To Previous Page
To Previous Page
Loading...
3: Specifications
Shop
Tek™ ST
4, ST5, ST7, ST11, ST15 Th
ree-phase 60 Hz User Manual
88292018-2
36 R00
30
Subject to EAR, ECCN EAR99
and related export c
ontrol restrictions.
3.9
Piping and instrument
ation—ST1
1, ST15
88290015-826 R03
35
37
Table of Contents
Main Page
Table of Contents
3
Section 1: Safety
7
General
7
Personal Protective Equipment
7
Pressure Release
7
Fire and Explosion
8
Moving Parts
8
Hot Surfaces, Sharp Edges and Sharp Corners
9
Toxic and Irritating Substances
9
Electrical Shock
10
Lifting
10
Entrapment
11
Implementation of Lockout/Tagout
11
Safety Warnings
12
Section 2: Description
15
Introduction
15
Compressor Component Description
15
Compressor Cooling and Lubrication System-Functional Description
20
Compressor Discharge System-Functional Description
20
Control System-Functional Description
21
Air Inlet System, Functional Description
24
Controller/Keypad
25
LCD Display
25
LED Lights
26
Section 3: Specifications
27
Tables of Specifications-Shoptek 5 - 20 Hp Three-Phase
27
Lubrication Guide
28
Application Guide
28
Lubrication Change Recommendations and Fluid Filter and Separator
28
Maintenance
28
Installation Drawings (ID), Piping & Instrumentation Diagrams (P&I)
28
And Wiring Diagrams (WD)
28
ID-St4, St5, St7
30
ID-St11, St15
32
Piping and Instrumentation-ST4, ST5, ST7
34
Piping and Instrumentation-ST11, ST15
36
Section 4: Installation
39
Compressor Mounting-Support and Location
39
Outdoor Installation (Sheltered)
39
Ventilation and Cooling
40
Service Air Piping
42
Pipe Sizing
43
Auxiliary Receiver Tank
43
Isolation Valves
43
Fluid Containment
43
Belt Check
43
Fluid Level Check
43
Electrical Preparation
43
Motor Rotation Direction Check
44
Section 5: Operation
45
Routine Operation
45
Section 6: Maintenance
47
General
47
Maintenance after Initial 50 Hours of Operation
47
Maintenance Schedule
47
Every 2000 Hours of Operation or Six Months (Whichever Occurs First)
47
Every 2000 Hours of Operation or One Year (Whichever Occurs First)
47
Every 4000 Hours of Operation or One Year (Whichever Occurs First)
48
Every One Year
48
Every Two Years
48
Fluid Maintenance
48
Fluid Filter Maintenance
48
Fluid Filter Replacement
48
Air Filter Maintenance
49
Air Filter Element Replacement
49
Separator Maintenance
50
Separator Element Replacement
51
Belt Maintenance
51
Belt Tension Measurement with Optikrik Tension Meter
51
Belt Tension Measurement with Frequency Meter
52
Belt Tension Adjustment
52
Related product manuals
Sullair ShopTek ST4
60 pages
Sullair ShopTek ST5
60 pages
Sullair FX-0065-075-AD-SG-NPT
48 pages
Sullair FX-0240-150-AD-SG-NPT
48 pages
Sullair FX-0350-150-AD-SG-NPT
48 pages
Sullair FX-0475-200-AD-SG-NPT
48 pages
Sullair FX-0700-200-AD-SG-NPT
48 pages
Sullair FX-1350-300-AD-SG-NPT
48 pages
Sullair FX-0130-0100-AD-SG-NPT
48 pages
Sullair OWS-88
24 pages
Sullair OWS-420
24 pages