Maintenance and Inspection (continued)
22
Component
Inspection
Instructions
Maintenance and Inspection Time Interval
Remarks
Daily
Every
500 Hours
or 2 Months
Every
2,500 Hours
or 1 Year
Every
5,000 Hours
or 2 Years
Every
10,000Hours
or 4 Years
Every
15,000Hours
or 6 Years
Every
20,000Hours
or 8 Years
Air Receiver
Tank (Option)
Drain accumulated
condensate in air receiver.
○
Complete Air
Compressor
Remove accumlation of dust
and/or dirt.
○
Inspect for excessive noise
and vibration.
○ Refer to page 25.
Safety Relief
Valve
Inspect operation. ○
Replace the safety
relief valve if there is
any damage.
Pressure Sensor
Inspect operation and confirm
valid pressure displayed.
○
Replace the sensor if
there is any damage.
Check Valve Inspect for leaks or replace. ○ ●
Ventilating Fan
Inspect or replace
the ventilating fan.
○ ● Refer to page 26.
Bolts, Nuts &
Screws
Inspect and tighten any
loose items.
○ Refer to page 26.
Intake Air Filter
Replace a dirty or
clogged filter.
○ ● ◎ Refer to page 26.
Sirocco Fan &
Scroll Fin
Clean the dirt off
these components.
○ ◎
Scroll Bearing
Grease or inspect
the bearing.
○ ◎
Replace the scroll head if
there is any damage with
bearing.
Tip Seal & Face
Seal
Replace the seals. ● ◎
Bearings Inspect the bearings. ○ ◎
Replace the scroll head if
there is any damage with
bearings.
Scroll Head
Replace the scroll
head.
●
Rubber Hose Inspect for leaks. ○ ●
Replace the rubber
hose if there is any
damage.
V-Belts
Inspect, adjust and/or replace
a loose or damaged v-belt
○ ● Refer to page 27.
Electromagnetic
Contactor
Inspect or replace. ○ ●
Rubber Vibration
Isolator Pads
Inspect for any damage
and/or hardness.
○
Replace the pads if
there is any damage.
Electric Main
Motor
Inspect for any damage. ○
Replace the motor if
there is any damage.
Coolers
Clean the dirt off or
replace.
○ ●
【145PSIG Model】
※ ○ represents the periodic inspection period during operation or after parts have been replaced and a ● represents the
parts replacement period.
※ ◎ represents parts that should be replaced at the same time as the scroll head replacement.
※ Operation time on the control panel digital display is the total running hours of the SRL air compressor.
※ The maintenance and service time intervals shown are for normal operation. The inspection period may differ slightly
for different operating conditions, such as high temperature and/or humidity. If the operating conditions are severe and/or
unsatisfactory, reduce the inspection time intervals.
※ Carry out the maintenance and inspections based on the recommended total operating hours and/or calendar time in the
maintenance schedule, whichever occurs first.
※ It is recommended to request maintenance and inspection from the local Sullair distributor for any items in the shaded
area ( ).