98 Netra T2000 Server Installation Guide • September 2006
optional components, 17
server into rack, ?? to 66
19-inch 2-post hardmount, 61
19-inch 4-post hardmount, 22
19-inch 4-post slide mount, 26
23-inch 2-post hardmount, 56
600 mm 4-post hardmount, 33
J
Java Enterprise System Software, 6
M
multicore processor, 4
N
network management port, 71
O
opening bezel, 16
optional components
installing, 17
P
port
alarm, 74
Ethernet, 69
locations, 67
network management, 71
serial management, 70
USB, 73
power supplies
fault monitoring, 10
power supply redundancy, 9
powering on the server, 78
preinstalled
Java Enterprise System Software, 6
Solaris OS, 5
R
rackmounting
2-post, 55
hardmount 19-inch, 61
hardmount 23-inch, 56
4-post, 21
cable management assembly, 41
hardmount 19-inch, 22
hardmount 600mm, 33
sliding rail 19-inch, 26
options
2-post, 56
4-post, 22
redundancy
fan, 9
power supply, 9
reliability, availability, and serviceability (RAS), 8 to
10
remote management, 7
S
safety precautions, 20
serial management port, 70
server
features, 3
power cycle, 90
powering on, 78
resetting, 90
views, 1
shipping insert, removing, 16
slide rail assemblies, 18
software configuration worksheet, 93
Solaris OS
booting, 89
preinstalled verson, 5
Sun Store web site, 18
system controller
common operations, 86
configuring network management port, 81
logging in, 80
network management port, 85
serial management port, 80
output, 78
system status LEDs
as environmental fault indicators, 10
See also LEDs
sytem controller
resetting, 84
T
temperature sensors, 9
thermistors, 9
U
UltraSPARC T1, 4