1.0 Product Overview
(1) Grid connector
(2) Backup connector
(3) BAT +
(4) BAT -
(5) ery circuit breaker
(6) PV connectors
(7) PV switch
(8) Wi-Fi port
(9) 
(10) LED display
Dimension: W×H×D=483×380×190mm

for SunPower Reserve
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
You must protect each inverter with an
individual AC circuit breaker in order to ensure
that the inverter can be disconnected safely
(X2)
(X16)
(X1
Grid-CT Grid-CT CablePV-CT
PV-CT Cable
)
(X1) (X1)
(X1)
(X1)
(X1)
(X1)
(X1)
(X1)
(X1)
(X1)
(X1) (X1) (X1)
(X1)(X1) (X2)
Approx. 10-12mm
For “Land “N
7-8mm
9 - 1 2 m m
Approx. 18mm for PE
L
N
PE
(X1)
click
click
7mm
7mm
PV1-F/UL-ZKLA/USE2
PV1- F/ UL -Z KLA/USE2
2.6-2.9 N·m

4
P 2×150mm
1.6 Nm
H
×2
QUICK INSTALLATION GUIDE
MODEL: RESERVE-INV-1-P5-L1-INT
click
1.2×75mm
P 2×150mm
4.5-5Nm
H
2
1
1. S

2. Connect the BAT -
the BAT + wire (Red)
01
02
03 04
φ
H
D
W
PH2×150mm
1.2×75mm

2.1 Scope of Delivery
2.2 Addional Materials Required for Installaon
2.3 Installaon Tools
3.2 Installing the Inverter

3.1 Before installing the inverter ensure that the baery is properly installed. For more details refer
to Baery Quick Installaon Manual or Safety and Installaon Instrucons.

4.1 Installing the PE cable
DANGER



4.2 Connecng the Grid Power Cable
4.3 Connecng the AC Backup Power Cable
4.4 Connecng the BAT Power Cable
4.5 Connecng the PV Power Cable
548268 Rev. A
P 2×150mm
2.5Nm
H
1
6
7
8
2
4
3
5
Step 1:
Installing the base of the inverter
Support sheet
metal
P 2×150mm
2.5Nm
H
11
12
Step 3:


P 2×150mm
2.5Nm
H
9
10
Step 2:
Lock right screws
Lock right screw

Grid side
Backup side

32A/40A
32A
Step 1
Step 2
Step 3

copper cable
²

threaded sleeve and swivel nut together

and PE into corresponding terminals

(torque 1.5
±0.1N·m).
Plug the connector into the

Step 1
Step 2
Step 3
Step 4
Step 5
Inverter Side BAT Side
BAT Power + and red Cable

BAT Power - and black Cable


screwdriver when unscrew the
swivel nut
Step 1
Step 2
Step 3
Step 4 Step 5 Step 6

Assemble the MC4 cable ends


Crimp pliers to
cable ends
Assemble the connectors
Please check if the cables are securely
installed by pulling outwards


Check the open-circuit voltage is less
than 580V
Remove the waterproof caps from
PV connectors

please seal it with the cap

hear an audible click.

5.1 Wi-Fi module Connecon
NOTICE
Phillips Screwdriver
Flat-Head Screwdriver
Wire Stripper Network Wire Clamp
Crimping Plier
Tape Measure




1
2
3
PH2×150mm
2.5Nm
4
Housing

conductor
M5
×12 PH2 head screw
PE Cable4
3
2
1
Step 2
1
2
Align the AC connector
Plug the AC connector
into the jack and screw tight
Step 1 Step 3
Assemble the locking cap, threaded sleeve
and swivel nut together.
Approx. 60mm
For “Land “N
7-9mm
Approx. 65mm for PE
Insert the crimped conductors, L, N
and PE into corresponding terminals
and tighten the screws
(torque 1.2±0.1N·m).
L
N
PE
PE
Three-core (L, N and PE) outdoor
copper cable
Conductor cross-section: 6-8 mm²
φ


energy release.





Grounding
BAT+ Power
Connector
BAT- Power
Connector
_
_
_
_
_
_
DC CablePV1-F
Conductor cross-
section4-6 mm²
Conduits
Ethernet Cables
Cat5eTP
V-resistant for
outdoor use
RJ45 Plugs
PE Terminal
6-8 mm²Grid Cable

²
Three-core outdoor
copper cable
DANGER
Question and Answer IconNeed help?

Do you have a question about the SunPower RESERVE-INV-1-P5-L1-INT and is the answer not in the manual?

SunPower RESERVE-INV-1-P5-L1-INT Specifications

General IconGeneral
BrandSunPower
ModelRESERVE-INV-1-P5-L1-INT
CategoryCamera Accessories
LanguageEnglish