EasyManua.ls Logo

Swagman STRADDLER - Final Clearance and Drilling; Periodic Checks and Notes; Important Notes; Rack Capacity and Installation

Default Icon
4 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
300 - 1880 Government St. • Penticton, B.C. Canada V2A 7J1 • Phone (250) 490-8883 • Fax (250) 490-8885 • www.swagman.net
REV 23/10/19
9. It is advisable to keep any part of Straddler or bike rack at least 3
inches from the trailer as some movement will happen while driving.
10. When all is conrmed drill holes through both sides of the A frame
assembly and the main cross bar. There are guide holes on each side
for easy drilling. (1/4” drill bit is required). There are a total of 8 holes
required. Two on each side of the upper A frame foot and two on
each side of the main cross bar.
11. Put the 4 (6mm x 45mm) allen bolts through the tube at these
previously drilled holes and tighten using nyloc nuts (diagram 8).
12. Check all set screws and bolts periodically to ensure they are tight.
Important Notes
• Thisrackisdesignedtoholdatwobikerackwithamaximumweight
including rack and bikes of 100 lbs.
• Followtheinstructionsofthemanufacturesbikerackfornotesand
warnings.
• ItisonlydesignedtobeinstalledonthefrontAframeofthetrailer.
Installing in any other location will void warranty
• Ensureyoudon’thaveexcessivemovementintheinstalledbikerack.
6
Set
Screw
Set
Screw
7 8
ATTN: STATE OF CALIFORNIA CONSUMERS
WARNING: Cancer and Reproductive Harm • www.P65Warnings.ca.gov
INSTRUCTION SHEET
PRODUCT: 80503 The Straddler A Frame Bike Rack
• Page 2 of 2

Related product manuals