EasyManua.ls Logo

Sym Citycom 300i - Page 132

Sym Citycom 300i
270 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
. Cylinder Head / Valve
6-15
Install cylinder head side cover (3 bolts).
Install thermostat (2 bolts).
Loosen auto tensioner adjustment bolt and
remove bolt and spring.
Install tensioner and install spring and adjustment
bolt.
Install cylinder cover (4 bolts).
Install Air Injection system (AI) pipe. (4 bolts)
Install inlet pipe onto cylinder head.
Install and tighten spark plug.
Torque value: 1.0~2.0kgf-m
Caution
This model is equipped with more precision
4-valve mechanism so its tighten torque can
not be exceeded standard value in order to
avoid causing cylinder head deformation,
engine noise and leaking so that motorcycle„s
performance be effected.
Install the engine onto frame (refer chapter 5).
To this chapter contents
3 bolts
Tensioner bolts
Thermostat bolts
4 bolts
4 bolts

Table of Contents

Other manuals for Sym Citycom 300i

Related product manuals