EasyManua.ls Logo

Sym Fiddle II 125 AW12W - Operational Precautions

Sym Fiddle II 125 AW12W
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. REMOVAL OF ENGINE SYM
5-2
OPERATIONAL PRECAUTIONS
General Information
Engine must be supported by a bracket or adjustable tool in height.
The following parts can be serviced with the engine installed on the frame.
1. Carburetor
2. Driving disk, driving belt, clutch, and transporting disk
3. Final reduction gear mechanism
Specification
Specification
Disassemble 850 c.c.
Engine Oil Capacity
Replacement 750 c.c.
Disassemble 110 c.c.
Gear Oil Capacity
Replacement 100 c.c.
Torque Values
Engine suspension bolt (frame side) 4.5~5.5kgf-m
Engine suspension nut (engine side) 4.5~5.5kgf-m
Bolt of rear shock absorber upper connection 3.5~4.5kgf-m
Bolt of rear shock absorber lower connection 2.4~3.0kgf-m
http://www.motorcycle.in.th

Table of Contents

Related product manuals