EasyManua.ls Logo

Taylor c713 - Page 32

Taylor c713
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C713 Operator TrainingC713 Operator Training
30
C713 Operator TrainingC713 Operator Training
Most of the listed parts are included in the tune-up kit.
Three Months Parts Replacement
Refer to the Taylor Operator Manual or local Taylor Distributor for part numbers.
Note: For air cooled units, condensers should be cleaned monthly with a soft brush.
Design Cap
Every 3 months replace the following:
Drive Shaft Seal
Freezer Door
Gasket
Mix Feed Tube
O-Ring
Front Bearing Prime Plug
O-Ring
Scraper Blades
Draw Valve H-Ring
(Center)
Draw Valve
O-Ring

Other manuals for Taylor c713

Related product manuals