6-6
OPERATING PROCEDURES
Models 8752 and 8756 with Horizon® Pump
Operating Procedures
6
4. Place the O-ring onto the body of the check valve
and lubricate.
Figure 6-20
5. Place the rubber poppet in one end of the spring. Do
not lubricate the rubber poppet.
Figure 6-21
6. Attach the opposite end of the spring onto the inlet
fitting of the check valve body.
‘
Figure 6-22
7. Place the cap over the spring and poppet. Secure the
cap to the check valve body by inserting the locking
pin.
Figure 6-23
8. Attach the check valve assembly to the pressure
switch cap.
Note: Make sure the quick disconnect is firmly
locked into position.
Figure 6-24
15161
Apply the appropriate
Taylor approved food safe lubricant.