5.3.7
Maximum charging current
(MCC)
f- r= f1+1 llFi
NLLUd 5U
Figure 1-17 Maximum charging
currenl setting
page
Function description:
Set the maximum
charging current value of
the inverter'
Setting conditions:
All slates can
be set.
MCC i Maximum
Charge Current, lhe
maximum charging current refers
to the maximum value of the
PV and
mains charging current.
3KV
150V-MPPT Version
is 2l10l2ol30l40l50160170l8ol9ol1ool110l120A
optional;
5KV-48V 450V
MPPT Voltage version
is 2/1OI20l3OI 4OI5016017OI80A optional;
Figure
1-18 Return to the home
page
setting
page
Function
description:
Return to the main interface settings.
Setling conditions:
All
states
can be sel.
illustrate:
The default setting is ON. In
the function setting operation,
when it is set to ON,
if the
page
is not in
the first
interface
(P1
)
at this lime,
il will return to the first interface after
1 minute; if it is set to OFF,
if
the
page
is nol in the first interface
(P1)
al this time, the
LCD willAlways stay on this interface.
5-3.9 Overload restart setting
(LrS)
rOdF
EB CIfi
LF5
09 0n
NdF
OE
OFF
tF5 8g
UFF
-18-
Figure
1-19
Overload
restart selling
page
Function
description:
Overload
restart setting.
Setting condilions: Allstaies
can be sel.
illustrate:
Overtoad
reslart is set to ON by defaull.
5. 3. 8 tr4enu
Front
(
MDF)