Do you have a question about the Techfrost JOF ONE and is the answer not in the manual?
Defines the intended applications and limitations of the blast chiller/freezer.
Details the machine's construction, capabilities, and key features like air circulation.
Outlines factory testing procedures, including visual, electric, and functional tests.
Covers compliance with European directives and essential safety standards for operation.
Specifies optimal placement criteria for the unit to ensure proper function and safety.
Provides an overview of the installation section and manufacturer's disclaimer.
Describes materials in contact with food and the type of coolant used.
Highlights risks associated with physical contact, sharp parts, and electrical components.
Details crucial steps for safe and efficient installation, including positioning and leveling.
Instructions for safely connecting the unit to the correct electrical supply.
Explains how to initiate the pre-cooling cycle to prepare the machine's interior.
Guides on the correct positioning and use of the optional core temperature probe.
Advises against covering containers to optimize air circulation for faster chilling.
Provides guidelines for arranging products to ensure efficient airflow and chilling.
Details how products should be covered and protected after the chilling process.
Outlines the basic steps for turning the machine on and initiating operations.
Defines the different operational states of the machine (off, stand-by, on, run).
Provides instructions on how to properly turn the blast chiller on and off.
Explains what information is shown on the display during different operational states.
Details the procedure to view the internal cell temperature on the display.
Guides on how to display the evaporator temperature from the control panel.
Provides instructions to show the condenser temperature reading on the display.
Explains how to manually initiate the defrosting cycle for the unit.
Describes the procedure to lock or unlock the control panel keypad.
Outlines how to mute or turn off the unit's audible buzzer.
Introduces the various operational cycles that can be managed by the device.
Details the two-phase process for standard blast chilling and subsequent conservation.
Explains the three-phase process for hard blast chilling and conservation.
Describes the two-phase cycle for blast freezing and its conservation phase.
Details the three-phase cycle for soft blast freezing and conservation.
Provides instructions on how to initiate the pre-cooling phase before other cycles.
Introduces the HACCP function for memorizing alarm events and their details.
Explains how to display recorded HACCP alarm information and event codes.
Details the procedure for clearing memorized HACCP alarm data from the system.
Guides on how to view the total operating hours of the compressor.
Explains the process for resetting or cancelling the recorded compressor hours.
Provides instructions for setting the current date and time on the device.