EasyManua.ls Logo

TECO A510-2001-H - Page 180

TECO A510-2001-H
311 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-126
Figure 4.3.59 Coast to stop
(3) 07-09=2:
. If the operation command is removed, the inverter will perform base block (b.b)
based on the minimum base block time (07-18) and the motor will be stopped by DC
braking set by 07-07.
.The DC braking time (t
DCDB
) of Figure 4.3.60 is determined by the set value of
07-08 (DC Braking start time) and the frequency that operation command is
removed.
(07-08)×10×output frequency
F
max
(01-02)
. If the over-current protection occurs in DC braking process, you can increase the
minimum b.b time (07-18) until the protection happens no longer.
. Please refer to Figure 4.3.60 to understand the function of DC braking to stop.
Figure 4.3.60 DC braking to stop
(4) 07-09=3
. If the operation command is removed, the inverter will perform base block and the
motor will be coasting to stop. Before the achievement of operation waiting time,
the inverter will not perform operation and the operation command will be ignored
if the operation is input.
. When the operation command is removed, the operation waiting time (T1) is
determined by the deceleration time (00-15,17, 22 or 24) and the output
frequency.
. Please refer to Figure 4.3.61
t
DCDB
=
Operation command
Output frequency
Time
Time
Minimum base block time
(
07-18
)
Block
Conduction Conduction
Output frequency
Conduction
Time
Time
Block
Tb.b: minimum base block time 07-180
Tocob: DC braking time
Maximum output frequency
Output frequency when the stop
command is performed.

Table of Contents

Related product manuals