All Site loads monitored with two integrated CTs
All Solar monitored with one auxiliary CT
All Site loads monitored with two auxiliary CTs
All Solar monitored with one auxiliary CT
INSTALL METERING
METERING OVERVIEW
Correct Metering Installation
L
A
B
E
L
CT ORIENTATION
CT Label Source of Power
Incorrect Metering Installation
Power Flow Power Flow
INSTALL OPTIONAL REMOTE DISABLE SWITCH
15
See Install Optional Remote Disable Switch in the Installation Manual for
information on switch operation and design considerations.
Non-Backup Site loads
are not monitored by
integrated CTs
Secondary Solar is
not monitored