QUALITY INFORMATION
Docnr. F-KWA-005
Versienr. 5
Uitgiftedatum 09/01/12
Blz. 1
Slip in the new fabric and replace the end caps To refit the fabric, carefully slide the leading edge into the
front profile. This should be carried out by 2 persons. Attention: ensure the fabric does not contact any sharp
edges which may cause damage
Take care that the ax is well positioned. Before you refix the fabric fixing screws back onto
the lead rail, roll the awning in and out once completely.
Roll it out again for about 50cm and, when necessary,
slide the fabric a little in the lead rail to make sure that the
spring arms are parallel.