EasyManua.ls Logo

TOHATSU V20D2S - Discharge Valve and Battery Installation

TOHATSU V20D2S
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
PREPARATION FOR OPERATION
Discharge valve
Make sure the discharge valve is closed.
V20E(S)
V20D2(S)
Battery installation (V20ES, V20D2S)
The battery mounted on the engine can be used immediately after filling cells with
electrolyte (1.28 specific gravity at 20°C=68°F). Refer to the INSTRUCTIONS on the
battery.
Do not operate the engine without the battery, the gauge lamp may
burn out.
6
1
1
22
33
44
55
66
77
88
9
9
10
10
1111
1212
13
14
15
16
17
18
13
14
15
16
17
18