TestingtheEZTurnSwitch(continued)
g202944
Figure107
5.TheEZturnswitchterminalsaremarkedasshowninFigure107.The
circuitryoftheswitchisshownintheCircuitLogicT able(page5–57).With
theuseofamultimeter(ohmssetting),testtheswitchfunctionstodetermine
ifcontinuityexistsbetweenthevariousterminalsforeachswitchposition.
Checkthecontinuitybetweentheswitchterminals.
CircuitLogicTable
SwitchPositionNormalCircuitsOtherCircuits
OFF
1+24+5
ON
2+35+6
6.ReplacetheEZturnswitchifnecessary.
7.Connecttheswitchtothemachinewireharness.Securetheconsolecover
tothehandle.
8.Connectthebatterypack;refertoConnectingtheLithiumBatteryPack
(page5–7).
Greensmaster
®
eFlex1800,2100and2120
Page5–57
ElectricalSystem:TestingtheElectricalComponents
12189SLRevE