InstallingtheLiftControlValves(continued)
5.Installtheliftleverpivot(item7)totheliftcontrolvalveandthepivotbracket
withthepreviouslyremovedfasteners.
6.Installtheleverguideplatewiththepreviouslyremovedfasteners.
7.Installtherightsidewheelshroud.
8.Installtheconsoletothemachine;refertoOperator’sConsole(page7–24).
Note:Donotsecurethedashassemblytotheconsoleuntilliftleveroat
positionhasbeenchecked.
9.Chargethehydraulicsystem;refertoRemovingandInstallingtheOperator’s
Console(page7–24).
10.Checktheoatpositionoftheliftleverandadjusttheleverguideplateif
necessary;refertothetractionunitOperator’sManual.
SandPro
®
3040and5040
Page5–91
HydraulicSystem:ServiceandRepairs
20251SLRevA