EasyManua.ls Logo

Toro Greensmaster 3120 - Page 57

Toro Greensmaster 3120
326 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InstallinganAdjustableFitting
g212224
Figure15
1.Locknut2.Back-upwasher
3.O-ring
g212225
Figure16
1.Step1:clearancethelocknut3.Step3:alignthetting
2.Step2:seattheback-upwasher4.Step4:tightenthelocknut
1.Ensurethatallthethreads,thesealingsurfacesoftting,andthecomponent
portarefreeofburrs,nicks,scratches,orunwantedmaterial.
2.Tohelppreventahydraulicleak,replacetheO-ringwhenyouopenthe
connection.
3.LightlylubricatetheO-ringwithcleanhydraulicuid.Ensurethatthethreads
ofthettingarecleanwithnolubricantapplied.
4.Turnbackthelocknutasfaraspossible.Ensurethattheback-upwasheris
notlooseanditispushedupasfaraspossible(Step1inFigure16).
5.Installtheadjustablettingintotheportbyhanduntilthewashercontactsthe
faceoftheport(Step2inFigure16).
6.Iftheadjustablettingneedstoalignwithanothercomponent,rotatethetting
counterclockwiseuntilitisalignedtothedesiredposition(Step3inFigure
16).Donotrotatetheadjustablettingmorethan1turncounterclockwise.
IMPORTANT
Beforetighteningthetting,determinethematerialusedfortheport
thettingisbeinginstalledin.Installingattingintoanaluminum
portrequiresreducingtheinstallationtorque.
7.Tightenthettinglocknut(Step4inFigure16):
Greensmaster3120
Page4–11
HydraulicSystem:GeneralInformation
17230SLRevC

Table of Contents

Other manuals for Toro Greensmaster 3120

Related product manuals