Multi Pro 1200/1250Page 7 -- 36Drive Train
22.Disassemble reduction shaft assembly:
A. Use a bearing puller to remove bearing (item 1)
from reduction shaft.
B. Remove 25T gear (item 2), collar (item 4) and
32T gear (item 5).
C. Use a bearing puller to remove bearing (item 6).
D. Removethrustwasher(item7),40Tgear(item8)
and needle bearing (item 9).
E. Remove retaining ring (item 10).
F. Remove synchro shifter (item 11) together with
springs, hub and three (3) keys.
G. Remove key (item 12) from reduction shaft.
H. Remove synchro ring (item 13) from 47T gear
(item 14).
I. Remove 47T gear (item 14), needle bearings
(item15)andthrustwasher(item16).Inspectneedle
bearings and replace if necessary. Measure thick-
nessofthrustwasher.Replacethrustwasherifthick-
ness is less than 0.0709” (1.8 mm).
3
5
15
14
13
7
4
16
12
11
9
8
6
1
2
10
Figure 49
1
2
3
4
5
12
16
15
14
13
11
10
8
9
7
6
13
Figure 50