TestingtheEngineSpeedControl(continued)
B.MeasuretheresistancebetweentheterminalsAandCandthenmeasure
theresistancebetweentheterminalsAandB.Recordtheseresistances.
Thetotalofthe2measuredresistancesshouldbeapproximately10,000
ohms.
C.RotatethespeedcontrolknobandrepeatstepB
5.Replacethespeedcontrolifnecessary.
6.Ifthespeedcontroltestscorrectlyandacircuitproblemstillexists,checkthe
wireharness;refertoAppendixA(pageA–1).
7.Installthespeedcontrolandconnectthewireharnessaftertesting.
8.Connectthebatterynegative(-)cableatthebattery.
ProForce®DebrisBlower
Page5–23
ElectricalSystem:TestingtheElectricalComponents
18237SLRevA