EasyManua.ls Logo

Toro Sand Pro 2040Z - Machine Break-in and Transport

Toro Sand Pro 2040Z
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Gasoline EnginePage 3 - 15Sand Pro 2040Z
2. Inspect carbon canister and attached hoses for dam-
age or obvious leaks. A damaged or leaking canister
should be replaced.
3. Remove fuel evaporative control system compon-
ents as needed using Figure 14 and the following as
guides.
IMPORTANT: To prevent damage to fuel hoses, ca-
ble ties are used to secure hoses to machine com-
ponents. Take note of all cable ties that are removed
from machine during the disassembly process so
the cable ties can be properly replaced during as-
sembly of removed components.
A. If hoses are removed from the carbon canister or
vacuum control valve, note hose location for as-
sembly purposes. Figures 15 and 16 identify hose
location.
B. If EVAP hoses are removed from engine fittings,
note hose location for assembly purposes. Figures
17 and 18 identify engine hose locations.
Assembly (Fig. 14)
1. Install all removed fuel evaporative control system
components using Figure 14 as a guide. Make sure that
evaporative system fuel hoses are not kinked and are
properly secured after installation.
2. If seat support plate with attached operator seat was
removed from machine, install seat assembly (see Op-
erator Seat in the Service and Repairs section of
Chapter 6 - Chassis). Make sure that s eat switch is con-
nected to machine wire harness and that wire harness
seat switch lead is secured t o seat support plate with ca-
ble tie during seat installation.
Figure 16
VACUUM CONTROL VALVE CONNECTIONS
1. Intake manifold hose 2. Air intake tube hose
Figure 17
2
1
1. Muffler
2. Washer head screw
3. R- clamp
4. EVAP manifold hose
5. EVAP intake hose
Figure 18
1
3
2
4
5
Gasoline
Engine

Table of Contents

Other manuals for Toro Sand Pro 2040Z

Related product manuals