InstallingtheSteeringControlValve(continued)
g351039
Figure65
1.Hosefrompiston(taction)pump–PortP
4.Hosetosteeringcylinderbarrelend–Port
R
2.TubetooilcoolerT eetting–PortT
5.Hosetosteeringcylinderrodend–PortL
3.TubetoliftcontrolTeetting–PortE
3.Installthesteeringwheel;refertoRemovingandInstallingtheSteering
Wheel(page7–13).
4.Installthefueltank;refertoRemovingandInstallingtheFuelT ank(page
4–12).
5.Chargethehydraulicsystem;refertoChargingtheHydraulicSystem(page
5–64).
6.Operatethesteeringsystemfromfullstoptofullstop.Ensurethehydraulic
hosesdonotcontactanythingpriortoreturningthemachinetoservice.
HydraulicSystem:ServiceandRepairs
Page5–100
SandPro
®
3040and5040
20251SLRevA