EasyManua.ls Logo

Toro titan zx - Page 57

Toro titan zx
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE
4-7
Toro TITAN 2009-2013 Service Manual
4
16. Apply Loctite
®
242 to the PTO clutch bolt threads.
17. Install the PTO clutch onto crankshaft. Be sure PTO
clutch engages with the clutch stop bracket.
18. Install and torque the PTO clutch bolt to specication
– 55 ft-lbs. (76 Nm).
19. Install PTO belt onto PTO clutch. Verify proper PTO
belt routing; see PTO Belt Replacement and Belt
Routing” on page 6-5. Install the PTO belt tensioner
spring to the deck.
20. Connect battery cables and verify engine oil level.
21. Safely start engine and verify proper operation.

Table of Contents

Related product manuals