Workman HD Series Page 6 − 55 Drive Train
36.Apply multi−purpose grease to O−ring and insert O−
ring into groove of transaxle case. Install cover and se-
cure with nut, lockwasher and cap screws. Torque
fasteners from 11 to 13 ft−lb (15 to 17 N−m).
NOTE: If equipped with optional PTO, install PTO as-
sembly after the transaxle has been installed in vehicle.
Plug transaxle opening to prevent debris entry into
transaxle.
1
2
3
1. Cap screw (5)
2. Nut
3. PTO cover
Figure 111
11 to 13 ft−lb
(15 to 17 N−m)
37.Install bell housing and secure with flange head
screws. Torque screws from 18.5 to 22 ft−lb (24.5 to
29.5 N−m).
38.Install extension spring.
1
2
1. Extension 2. Flange hd screw (9)
Figure 112
18.5 to 22 ft−lb
(24.5 to 29.5 N−m)