4400 Series UPS Seismic Kit Installation Instructions – 94016-002
3 4400 80kVA Seismic Installation
Table 3 lists the contents of the 4400 80kVA Seismic Kit 4400800SEISMICKIT. Figure 3.1 shows the order
of assembly for the [bolt + lockwasher + washer] fastener group.
TABLE 3 80 KVA SEISMIC KIT CONTENTS
440800SEISMICKIT Contents
No. P/N* Description Quan
5 66437 TOP SEISMIC BRACKET 1
7-a – Hex Bolt, 1/4—20,1-1/2” 2
7-b – Flat Washer, 1/4 2
7-c – E—Ring, F/0.25 Shaft 2
11-a – Hex Bolt, 5/16—18 x 1” 4
11-b – Lock Washer, 5/16 4
11-c – Flat Washer, 5/16 4
– 94016 4400 Seismic Kit Installation Manual 1
80 kVA
1. Prepare the oor anchorages. Arrange the anchorages to ac-
commodate the nal layout including placement for ancillary
battery and/or Auxiliary cabinets. (Figure 3.3)
2. Prepare the wall anchorages. Key measurements o the an-
chorage placement in Step 1. (Figure 3.4)
3. Table 3 lists the components of the 80kVA Seismic Kit. Figure
3.2 show the Seismic anchorage component in the Seismic Kit
for the 80kVA cabinets.
4. Assemble the fastener groups in Table 3, [7a-7c] and
[11a-11c] as shown in Figure 3.1.
5. Secure the Top Seismic Bracket [5] to the top rear of the UPS
using three (3) fastener group [11]. (Figure 3.5)
6. Position the 80 kVA cabinet over the four oor anchors and se-
cure the unit.
7. Secure the Top Seismic Bracket to the wall anchors using 5/16”
Bolts.
8. Once installation is complete, secure the door of the cabinet us-
ing the two (2) Fastener Group [7]. (Figure 2.8)
a
b
c
FIGURE 3.1: FASTENER
GROUP (BOLT +LOCK
WASHER + WASHER)
P/N 440800SEISMICKIT
80 kVA
5
7
FIGURE 3.2: SEISMIC KIT
COMPONENTS (80 KVA)