EasyManua.ls Logo

Toshiba B-EX4 - Page 45

Toshiba B-EX4
207 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT EO18-33027
(Revision Date: Aug. 24, 2011)
4.4 RIBBON SAVING MODULE (B-EX904-R-QM-R)
4-30
4. Secure the two portions of the Solenoid Base Plate with the M-3x6 Screws, as shown below.
5. Fold (or stack) tag paper to make a 1.5-mm thick paper stack, insert it between the Print Head and the
Platen, and turn the Head Lever to TAG position. (The purpose of this is to make a 1.5 mm height
clearance between the Print Head and the Platen.)
6. Loosen the M-3x6 screws that temporarily secure the Solenoid to the Solenoid Base Plate.
7. Push the Solenoid from the both sides, as shown below.
8. Tighten the M-3x6 screws loosened in the previous step.
Loosen the M-3x6 screws.
M-3x6 screw
M-3x6 screw
Solenoid Base Plate

Table of Contents

Related product manuals