4. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT EO18-33027
(Revision Date: Aug. 24, 2011)
4.10 UHF RFID KIT (B-EX700-RFID-U2-US/EU/CN-R)
4-52
8. Put the Ribbon Guide on the Print Head Block.
c First insert the shaft of the Ribbon Guide on this side, then the other side into the holes of the
removed Ribbon Guide Shaft.
d Push up the Ribbon Guide so that the hooks are placed onto the right-hand Ribbon Guide Shaft.
4.10.3 Attaching the Antenna Ass’y
Assembling the Antenna Ass’y
1. Connect the Antenna Cable to the Antenna until it clicks.