8
3. Electrical installation
•Open the cover box.
•Pass PMV cable (Field supply, 6 wires) from Dx-controller through cable gland and connect the cable
wires into the terminal box following instructions as describe in the following. Route the cable out of
the Dx-PMV kit box according to figure below and fix with the support tie wrap.
A
PMV (Pulse motor wiring)
RBM-A0121/0301/0601/0961GUL : 6 wiring
RBM-A1681GUL : 5 wiring
•Use the screwdriver (-) and follow indicated instructions for connecting cable wires into the terminal
connector according to the circuit diagram.
•Make sure that field wiring and insulation is not pinched when closing the Dx-PMV kit cover box.
•Close the Dx-PMV kit cover box by 4 screw.
RBM-
A0121GUL
A0301GUL
A0601GUL
A0961GUL
A. PMV terminal box
B. Cable gland
C. Support tie wrap
D. Electric wiring work (Field supply, 6 or 5 wires)
E. Cable gland
F. Terminal connector