13
June 2004 © TOSHIBA TEC e-STUDIO200L/202L/230/232/280/282 FUSER UNIT
13 - 17
[I] Thermostat
(3) Take out the thermistor by removing 1 screw
each.
Note:
When installing the thermistors, check the
length of the harness first and distinguish the
installation positions of the side thermistor
and edge thermistor by the length of each
harness.
Fig.13-23
Fig.13-24
(1) Take off the pressure roller
(! P.13-15 "[F] Pressure roller").
(2) Place the fuser unit upside down. Release
the latch and take off the harness cover.
Fig.13-25
Thermistor
Center thermistor
Side thermistor
Edge thermistor
Harness cover