EasyManua.ls Logo

Toshiba GR200 Series - (i) CB operation

Toshiba GR200 Series
1770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6F2S1914 (0.49)
GRL200 (Soft 033 & 037)
- 1491 -
(i) CB operation
Figure 12.11-2 shows how to open CB (Off position).
Control
10:48 1/6
_Circuit Breaker >
SPOS >
DPOS >
TPOS >
Software Switch >
Auto Sequence >
DPOS_SYN_Dev1
10:48
Control execution
Push O button
Select control POS:
On
CANCEL:Operation stop
DPOS_SYN_Dev1
10:48
Selecting...
DPOS_SYN_Dev1
10:48
Current status:
On
Select control POS:
_Off
Change start?
ENTER:Yes CANCEL:No
[
ENTER]
Double
responses?
DIR mode
SBO mode
Output the command
Executing screen
Waiting for the
second response
Selecting succeeded.
Selecting failed.
DPOS_SYN_Dev1
10:48
Operation failed.
CAUSE:
Select failed.
Control
10:48 1/6
_DPOS_SYN_Dev1 >
On
[
ENTER]
[
ENTER]
DPOS_SYN_Dev1
10:48
Controlling...
CANCEL: Operation stop
DPOS_SYN_Dev1
10:48
Operation canceled.
[CANCEL]
DPOS_SYN_Dev1
10:48
Operation failed.
CAUSE:
Select failed.
Cancel failed
Cancel succeeded.
DPOS_SYN_Dev1
10:48
Operation completed.
[CANCEL]
Time out
1
DPOS_SYN_Dev1
10:48
Operation failed.
CAUSE:
Time limit over.
[ ]
[ ]
[ ]
[ ]
Control
10:48 1/6
_Circuit Breaker >
SPOS >
DPOS >
TPOS >
Software Switch >
Auto Sequence >
Control
10:48 1/6
_Circuit Breaker >
SPOS >
DPOS >
TPOS >
Software Switch >
Auto Sequence >
Open
Controlling failed
[ ]
Control
10:48 1/6
_Circuit Breaker >
SPOS >
DPOS >
TPOS >
Software Switch >
Auto Sequence >
O
Figure 12.11-2 Operation for opening CB
1
Note: Time out will occur if no responses come from CB device.
2
Note: For control Circuit breaker, the user should connect DPSY01 function with
circuit breakers using binary IO modules. See chapter
Control and monitoring
application: Double position controller with synchronizing-checking (DPSY)
.

Table of Contents

Related product manuals