EasyManua.ls Logo

Toshiba GR200 Series - Page 1762

Toshiba GR200 Series
1770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rev. and
Date
Section
(page)
Change place and contents
Approved
by
Checked by
Prepared by
Chap. 13.5
Revised the contents for removal and attachment;
Removed the contents for conventional IED cases
K. Oohashi
Apr.26
K. Oohashi
Apr.26
T. Kaneko
Apr. 26
0.28
Aug 9, 2017
Chap. 2.10
Corrected ZS and ZG equations (2.10-17) and (2.10-18)
K. Oohashi
July.26
K. Oohashi
July.26
T. Kaneko
July 25
Chap. 2.35
Revised the setting Tips and notices of [SYN-Angle]
and [T_SYN] in VCHK
G. Suzuki
Aug. 9
K. Oohashi
July 31
T. Kaneko
July 31
Chap. 2.35
Corrected the incoming voltage about the relationship
between Vs, Vs2, Vb in VCHK
Y. Sonobe
Aug. 9
G. Suzuki
Aug. 3
T. Kaneko
Aug. 3
Chap. 2.36
Corrected the Equation expansions in Equations (2.36-
2) and (2.36-6)
K. Oohashi
June.16
K. Oohashi
June.16
T. Kaneko
June 14
Chap. 2.37
Corrected Ry addresses of Star network in Fig 2.37-1
K. Oohashi
July.5
T.Kawasaki
July 5
T. Kaneko
June 30
Chap. 4.6
Added the setting Tips and notices of [SyncR1-Angle]
and [SYNC01_TSYN] in Sync check
K. Oohashi
Aug. 9
K. Oohashi
Aug. 9
T. Kaneko
July 31
Chap. 10.2
Corrected Function ID number of CHK_PLC_DAT
K. Oohashi
June.6
K. Oohashi
June.6
T. Kaneko
June 6
Chap. 10.5.4
Added the notice in the content of Communication
failure (Com fail)
K. Oohashi
June.16
K. Oohashi
June.16
T. Kaneko
June 13
Chap. 11.3
Corrected the definitions of quality bits in IEC61850
K. Oohashi
June.6
K. Oohashi
June.6
T. Kaneko
June 6
Chap. 11.4
Revised the values of Time-tagged message in Table
11.4-3&4
K. Oohashi
June 15
K. Shibata
June 14
T. Kaneko
June 14
Chap. 11.4
Revised the DPI number and its characteristics in
Chap 11.4.5.(ii)-6
K. Oohashi
July 26
M. Okai
July 25
T. Kaneko
July 25
Appendix 4
Corrected the “Sr1” and “Sr2” validity values in the
PIXIT table
K. Oohashi
June.16
K. Oohashi
June.16
T. Kaneko
June 14
Appendix 11
Added the notes for Dielectric voltage test
K. Oohashi
Aug. 3
T.Sugamoto
Aug. 3
T. Kaneko
Aug. 2
0.29
Oct. 2,2017
Chap. 2.7
Corrected the signals coming from DIFL function in
Fig. 2.7-3
K. Oohashi
Aug. 22
K. Oohashi
Aug. 22
T. Kaneko
July 21
Chap. 2.35.3
Corrected the contents about synchronism condition;
Revised the Notice and tips for SYN check relay
Y. Sonobe
Aug. 22
K. Oohashi
Aug. 22
T. Kaneko
Aug. 21
Chap. 4.6.2
Revised the Tips and notices of Synchronism-relays in
SYNDIF
K. Oohashi
Aug. 22
K. Oohashi
Aug. 22
T. Kaneko
Aug 21
Chap. 10.2
Modified the LRE error message
K. Oohashi
Sep. 20
M. Okai
Sep. 20
T. Kaneko
Sep. 7
Chap. 11.2
Added HSR and RSTP protocol
K. Oohashi
Sep. 20
M. Okai
Sep. 20
T. Kaneko
Sep. 7
Chap. 13.1
Added an explanation of white-plastic-sheets for
covering the screw holes on the case sides
K. Oohashi
Sep. 28
M. Ueda
Sep. 28
T. Kaneko
Sep. 27
Appendix 6
Added RPR/HSR, RSTP ordering 4 at position U in
Software selection; Remove selection of 3 code
K. Oohashi
Sep. 20
M. Okai
Sep. 20
T. Kaneko
Sep. 7
Appendix 10
Revised the contents of rack mounting kits; modified
the contents about rack mounting
K. Oohashi
Sep. 28
M. Ueda
Sep. 28
T. Kaneko
Sep. 27
--
Republished under the spin-off company
K. Oohashi
Sep. 28
K. Oohashi
Sep. 28
T. Kaneko
Sep. 28
0.30
Nov. 20,2017
Chap. 2.36
Corrected the delay difference equation (2.35-6) and
the range of Tdd setting with [CH1_TCDT]
K. Oohashi
Nov. 1
K. Oohashi
Nov. 1
T. Kaneko
Oct. 31
Chap. 5.2
Revised the contents for changing rated current on
VCT
K. Oohashi
Nov. 10
K. Kobayashi
Nov. 8
T. Kaneko
Nov. 7
Chap. 5.3
Added how to change the CPU to the constrain mode
with a jumper
K. Oohashi
Nov. 10
K. Kobayashi
Nov. 8
T. Kaneko
Nov. 7
Chap. 5.3
Deleted the contents about GIO communication
module; revised the rule on Table 5.3-3
K. Oohashi
Nov. 10
K. Kobayashi
Nov. 8
T. Kaneko
Nov. 7
Chap. 10.1
Corrected the notice about 61850 quality value in Table
K. Oohashi
K. Oohashi
T. Kaneko

Table of Contents

Related product manuals