EasyManua.ls Logo

Toshiba GR200 Series - 4.9.5 Measurement of operation Intervals

Toshiba GR200 Series
1770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6F2S1914 (0.49)
GRL200 (Soft 033 & 037)
- 962 -
4.9.5 Measurement of operation Intervals
The TPOS01 function can measure operation intervals time†, the intervals OT1 and OT2 can
represent the period of time when an earth-switch changes a position from another position.
As shown in Table 4.9-27 the eight intervals are defined as switching as shown in Figure 4.9-50
to Figure 4.9-53. The user should set scheme switch [TPOS01-OPETMEN] On.
Signal TPOS01_PT_P1
Signal TPOS01_PT_P2
Signal TPOS01_PT_P3
Signal TPOS01_P2EX_BO
OT1
OT2
Sensing intermediate state
P1
P2-control
P2
Intermediate
a. Switch motion (P1 to P2)
b. Operate command and signals with regard to the switch motion (P1 to P2)
Intermediate
P3
Figure 4.9-50 Two Intervals (OT1 and OT2) for P2 control
Signal TPOS01_PT_P1
Signal TPOS01_PT_P2
Signal TPOS01_PT_P3
Signal TPOS01_P1EX_BO
OT3
OT4
Sensing intermediate state
P1
P1-control
P2
Intermediate
a. Switch motion (P2 to P1)
b. Operate command and signals with regard to the switch motion (P2 to P1)
Intermediate
P3
Figure 4.9-51 Two Intervals (OT3 and OT4) for P1 control
Signal TPOS01_PT_P1
Signal TPOS01_PT_P2
Signal TPOS01_PT_P3
Signal TPOS01_P2EX_BO
OT5
OT6
Sensing Intermediate state
P3
P2-control
P2
Intermediate
a. Switch motion (P3 to P2)
b. Operate command and signals with regard to the switch motion (P3 to P2)
Intermediate
P1
Figure 4.9-52 Two Intervals (OP5 and OP6) for P2 control

Table of Contents

Related product manuals