189
To start the operation
1 Press the [ ] button and the [
] button at same time for 4
seconds or longer on the top screen to display the “FIELD SETTING
MENU”.
2 Press the [
] / [
] button to select “Floor drying” on the
FIELD SETTING MENU, then press the [
] button.
3 Press the [
] button to select the ON, then press the [ ]
button.
The
4 Start the heating operation on the top screen.
SET
ON
OFF
MON
HOT WATER
HOT WATER